Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - TD-DEV-1024-00283
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | 06/10/25, pre-con was held for both wall and building site. Wall and lot addition will be completed first. No NPPO or Stormwater is needed here. |