Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/04/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
inform the contractor that he needs to call in every two weeks. Contractor has forms set up for the sidewalk. I am forwarded. He needed some compaction test on it. He said he will comply with that. There is some curb that the contractor wants to remove I informed him to call right of way inspector so he could remove this curb, the curb belong to the City Of Tucson in right away |