Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/16/2026 |
ENGR Engineering Final
|
|
Passed |
3/16/26 - Development Package is complete in accordance with approved plans and As-Built drawings. |
| 08/13/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor needs to finish the landscaping and install the handicap parking sign. And have a set of plans on site when the next inspector comes out to inspect the engineering final. |
| 08/14/2025 |
ENGR Engineering Final
|
|
Partial Pass |
contractor is not on site, but he left a set of plans here according to the plans contractor was supposed to construct a new driveway apron in the front |
| 09/09/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor did not remove and replace the apron. He informed me he was going to ask about it and take it into the city to see if it will be approved as is. |