Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/10/2024 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
I inspected the trash enclosure for the contractor while I was here for the pre-con. The footing is missing two number four in the front they need to be put in before they pour the concrete footer. |