Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
Permit Number - TD-DEV-1023-00433
Inspection Description - For trash and recycling enclosures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2025 | For trash and recycling enclosures | Partial Pass | Contractor, good to poor grout in the front retaining walls at 4 foot | |
| 06/26/2025 | For trash and recycling enclosures | Passed | ||
| 10/17/2024 | For trash and recycling enclosures | Partial Pass | Contractors good to pour the footer for the generator that they’re installing on the north east side of the building | |
| 10/22/2024 | For trash and recycling enclosures | Partial Pass | Contractors good to grout the walls for the trash enclosure | |
| 10/23/2024 | For trash and recycling enclosures | Partial Pass | Contractors going to grout the first 4 foot for the walls for the generator on the north east corner of the building | |
| 10/31/2024 | For trash and recycling enclosures | Passed | Contractors good to go to the top of the wall | |
| 12/09/2024 | For trash and recycling enclosures | Partial Pass | My dad is good for the floor and the apron for the trash enclosure. Also good to pour for the floor for the generator on the north east quadrant of the building. | |
| 12/16/2024 | For trash and recycling enclosures | Partial Pass | contract is good to pour the retaining wall on the east end of the of the building walls 120 x 3‘ high | |
| 12/30/2024 | For trash and recycling enclosures | Partial Pass | Contractor, good to pour the retaining wall in the front footer |