Inspection History Details
Inspection Status: Passed
Inspection History: Final inspection to ensure all landscape and water harvesting SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2025 | Final inspection to ensure all landscape and water harvesting SITE | Passed | 10/20/25 Areas that allow for 3" to 9" maximum depression more than 10' from building and more than 1' from curbs are depressed. Where slopes and existing structures are located this is not possible and no grading was done in this scope of this project. The areas in plan are depressed and comply within reason considering these conditions. |