Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2024 | COT - ENGR - Stormwater | Partial Pass | Contractor needs to call us back out for the bedding of the CMP pipe per detail 108 | |
09/24/2024 | COT - ENGR - Stormwater | Partial Pass | Contractor removed all the backfill for the CMP pipe to expose it and place bedding sand underneath the CMP pipe has called per plan | |
09/26/2024 | COT - ENGR - Stormwater | Complete (Recurring) | Wattle needs to be replaced and repaired along the north fence line. | |
10/01/2024 | COT - ENGR - Stormwater | Partial Pass | The catch basin number two on the northwest side of the building is good to pour. The light pole foundations are good to poor. |