Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Canceled
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/14/2025 |
ENGR - Drainage Structures |
|
Canceled |
|
| 01/24/2025 |
ENGR - Drainage Structures |
|
Passed |
bollards in front of the vinyl fence in front of the play area were looked at today, 3’ in depth. 1 in front of each panel. |
| 09/26/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Storm sewer pipe, drainage structures, ready to backfill. |
| 10/09/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Good to backfill the CMP pipe catch basin. And backfill the 8 inch downspout drained that goes into the storm drain |