Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - TD-DEV-1022-00008
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/14/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | I met with Kyle from K.E.G. and other members from K.E.G. on site about this project to get an understanding where they are at and what they have been doing. I reminded Kyle/KEG the contractor for this permit that this permit is not in issued status in EnerGov and no work for this permit should be happening at this time. They have advised me that they’ve done only clearing and grubbing on the site and some stockpiling of material to be used for the pads and a place that material along the south west side of the property. Currently, they are also excavating to remove an existing waterline that will be replaced under a water permit done by the Tucson Water Department but that is the only work that really appears to be happening at this time. I have advised him that this meeting today for a Precon was only a precursor airy meeting for a future of Precon. Once the permit has been placed an issued status and work and truly begin legally. I drove through the site, took some photos of what the site looks like at this time and then left the site at around 10:30 AM. | |
07/18/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | ||
07/18/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | Met with the Contractor’s for this site last week and took Loran Shamis and Stephen Blood through the site to ensure that everything is being done correctly. They have looked through the site and we agree that no additional measures will be needed at this time for the area between Pad #3 and #4. We will monitor this area and I will check in on it every 2 weeks and will stay in touch with our review staff through the duration of this project. | |
08/11/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | ||
08/11/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | Kyle track-out protections in place, temp fencing. ADEQ out earlier in week due to excessive track out. |
|
09/01/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
09/01/2023 | PDSD Engineering Division Pre-Construction SITE | Passed |