Inspection Status: Partial Pass

Inspection History: PDSD Site/Engineering Division - NPPO

Date Description Inspector Results Comments
07/18/2023 PDSD Site/Engineering Division - NPPO Partial Pass
09/01/2023 PDSD Site/Engineering Division - NPPO Not Ready This inspection will be done once the end PPO plans for this site has been made available to be utilized during the inspection
10/05/2023 PDSD Site/Engineering Division - NPPO Partial Pass four large saguaro, cactus in nursery at emergency entrance
10/10/2023 PDSD Site/Engineering Division - NPPO Partial Pass saguaro nursery at South front entrance
10/27/2023 PDSD Site/Engineering Division - NPPO Partial Pass
12/29/2023 PDSD Site/Engineering Division - NPPO Partial Pass saguaro, cactus at site entrance appear to be in poor shape.