Inspection Status: Passed
Inspection History: Consultation SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/03/2025 |
Consultation SITE |
|
Passed |
Okay for TCO level 1 - Building 9. Discussed sidewalk and water harvesting deficiencies. |
| 02/03/2025 |
Consultation SITE |
|
Partial Pass |
good for TCO level four. The hand railing The Southwest corner of building nine needs loops on both sides. The drainage in that area needs to take another look at it. |
| 04/02/2025 |
Consultation SITE |
|
Passed |
|
| 12/10/2024 |
Consultation SITE |
|
Partial Pass |
Contractor needs a complete the railing and R&R this some of the sidewalk |