Inspection History Details
Inspection Status: Passed
Inspection History: NPPO Pre-Construction
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2026 | NPPO Pre-Construction | Passed | Applicant requests 0900 initiation. 9.23.26 -- Chad Keller, PDSD landscape architect and Joshua Garcia, PDSD Inspection Supervisor held an on site pre-construction meeting with staff members from Costco, the general contractor, Terracon and the plant salvage subconsultant. - Established time frame for the plant salvage company to begin work. Tentatively near the beginning of December and will need approximately 1 month to 6 weeks to complete salvage work. - Established NPPO monitor reporting schedule and submittal process. - (1) Pima Pineapple located on site; research what can and can't be done with salvaging this specific protected native plant. Will coordinate next steps. - Identified the general location of the temporary native plant nursery at the north portion of the site. It will be located in close proximity to an available water source on site for temporary irrigation. - Terracon to provide a revision to the grading permit plan set that includes the nursery location and irrigation water source; native plant inventory description and point locations. |