Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2026 | Partial Pass | 01/09/26 Contractor has rough cut the three large basins and the 8" inch deep basins next to the playground. Enhanced infiltration area also cut. Basins built to plan and survey and are almost complete with grading. 1 12" HDPE drain pipe between the two large basins is installed. 4 12"HDPE drain pipes from basin into citation wash also installed. These pipes were backfilled with 12" compacted lifts and. They were in a rush to finish the drain pipe into citation wash because of recent rains. If not installed The side of the basin would've been open to the wash. Compaction testing will be done on basin slopes, and tops and all fill areas to 95% density walking paths and sidewalk.. Contractor will schedule inspection for reinforced riprap drainage structures with reinforced toe downs next week. All density testing to be submitted to the portal. |
||
| 05/01/2026 | Passed |