Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
| Date |
Description |
Inspector |
Results |
Comments |
| 11/05/2026 |
For trash and recycling enclosures |
|
Partial Pass |
OK to pour footer then build wall.. contractor wants to grout wall in one lift. This is OK with weep holes at bottom course with pictures of grout through the holes. Or we will have to observe grout/vibrating. Schedule pre grout inspection prior to grouting to check bond beam. |
| 11/13/2026 |
For trash and recycling enclosures |
|
Partial Pass |
Okay to grout walls of RE to top. Schedule inspection prior to pouring bollards and floor rebar mat |