Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
03/17/2025 PDSD Engineering Division Pre-Construction SITE Passed For the contractor to call Lynn as needed, and when he put in the CAMP pipe 12 inches.