Inspection Status: Partial Pass
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 02/23/2024 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
No issues or concerns at this time. |
| 03/14/2024 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
no concerns at this time |
| 04/02/2024 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
|
| 04/17/2024 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
no issues at this time. |
| 05/07/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
No concerns at this time. Everything looks good. |
| 06/14/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
Site maintained. |
| 07/11/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
Site looks great |
| 08/08/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
Site is in good condition, no concerns. |
| 08/23/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
No concerns at this time all stormwater issues appear to being handled by the stormwater controls in place for the new construction. The contractor is working, mainly on vertical construction at this time grading has only been partially done and appears to being handled by the stormwater BMPs that are in place throughout the site. |
| 10/07/2024 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
contractors go to pick up the Wattles on the southside of the project where they installed the Masonary wall |
| 11/12/2024 |
SITE - Stormwater Follow-up
|
|
Passed |
|