Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 04/17/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
rebar for walls, excavations for bollards present. |
| 05/01/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
walls at full height, but not grouted, advised knock outs at every cell being grouted, advised top bond beam with #5 rebar. |
| 05/07/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor can pour the floor for the trash enclosure and the apron to |
| 09/17/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor finishing the sidewalks on the west side of the building and installed the sidewalk scuppers at the same time |
| 11/05/2024 |
ENGR - Drainage Structures |
|
Passed |
|