Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2025 | ENGR Engineering Final | Not Ready | Complete swales per approved plan. Reinstall paver path, cannot exceed 5% running slope. non-compliant at entryways. | |
| 11/18/2025 | ENGR Engineering Final | Not Ready | Stem Wall corrections required. Per telephone conversation, call out Stem-Wall inspection when wall is exposed for correction. | |
| 12/03/2025 | ENGR Engineering Final | Not Ready | 12/3/25 Slopes around retaining wall needs to be compacted. Slopes over three to one need a rip rap for erosion control. |
|
| 12/15/2025 | ENGR Engineering Final | Passed |