Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2025 | ENGR Engineering Final | Partial Pass | Contractor has a lot of irrigation lines to to backfill | |
| 11/05/2025 | ENGR Engineering Final | Partial Pass | Revision required to reflect as-built status. |