Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2024 | ENGR - Drainage Structures | Partial Pass | All (13) column footer depths of 13’ for canopy (A) are completed and #7 rebar welded to base of columns are present. All (3) column footer depths of 8’ for canopy (B) are completed and #7 rebar welded to base of columns are present. Concrete to be poured today at 10: a.m. |
|
| 03/26/2024 | ENGR - Drainage Structures | Passed | Viewed (8) remaining column footers all at 11’ depths and 30” width’s and all #7 rebar is welded to base of steel columns, footers are okay to pour. |