Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/13/2026 |
ENGR Engineering Final
|
|
Not Ready |
|
| 11/10/2026 |
ENGR Engineering Final
|
|
Not Ready |
Corrections were made to satisfy rainwater harvesting plan. Everything is good on site except holes to hold Refuse Enclosure gates in open position have not been drilled. North handicap space needs to be per plan. sidewalk ramp landing at top of ramp need to comply. over 2% cross slope. Curb cut in basin needs to be cut. |