Permit: TD-DEV-0825-00216

Parcel: 105102440


Addresses:

495 E WETMORE RD

Inspection Status: Not Ready

Inspection History: Final inspection to ensure all landscape and water harvesting SITE

Date Description Inspector Results Comments
10/13/2026 Final inspection to ensure all landscape and water harvesting SITE Not Ready -East side of building (area A on Rainwater Harvesting page of plan) are not sufficient. Plans call for Landscaping and Water harvesting infiltration areas to be depressed 6".
Refer to detail H on page 2. Detail 11 on page 10 is also helpful for this.
-The boulder east of building can remain in place and the area around it depressed.
-Depth of WHIA depression at parking Island at far Northeast should be increased so it can infiltrate more water.
-Saguaro at bottom of basin needs to be relocated. It is tipped over and that area will be too soggy for it.