| 02/02/2026 |
|
|
Partial Pass |
contractor is good to pour 300 lineal feet of footer for the wall |
| 02/04/2026 |
|
|
Partial Pass |
Contractors good to pour the footer for the wall on the south end |
| 02/09/2026 |
|
|
Partial Pass |
Contractor called in for the wall footing that passed last week no need for another inspection for the footing |
| 03/09/2026 |
|
|
Partial Pass |
contractor is good to pour the footer for the perimeter wall on the southeast end of the property |
| 03/23/2026 |
|
|
Partial Pass |
good to pour the footing on the north east corner of the property 160 lineal feet |