Permit: TD-DEV-0824-00227

Parcel: 13612004H


Addresses:

2755 S HARRISON RD

Inspection Status: Partial Pass

Inspection History: SITE - Sign Footer/Setback/Excavation Layout/Rebar

Date Description Inspector Results Comments
06/08/2026 SITE - Sign Footer/Setback/Excavation Layout/Rebar Partial Pass Perimeter wall: footing dimensions and reinforcement are correct. Okay to pour footing.
09/09/2026 SITE - Sign Footer/Setback/Excavation Layout/Rebar Partial Pass This is a wall inspection. OK to grout first lift. Vibrate all grout fill every cell 12 inches above grade and then every reinforced cell. Reschedule this pre-grout inspection when wall is built to the top for us to see bond beam.
09/17/2026 SITE - Sign Footer/Setback/Excavation Layout/Rebar Partial Pass This is a wall pre-grout inspection. Wall is built to 6 feet bond beam is in place. Okay to grout and vibrate all reinforced cells. Schedule this inspection again when grouting.
09/23/2026 SITE - Sign Footer/Setback/Excavation Layout/Rebar Passed Wall is grouted correct. Okay to backfill and cap it for completion.