Inspection Status: Partial Pass
Inspection History: NPPO Pre-Construction
| Date |
Description |
Inspector |
Results |
Comments |
| 07/25/2024 |
NPPO Pre-Construction |
|
Partial Pass |
Contractor requested an inspection for the footers and rebar for trash enclosure. They’re good for. |
| 08/01/2024 |
NPPO Pre-Construction |
|
Partial Pass |
Contractor called in the wrong inspection. He needed to call Lynn for trash, enclosure footer, and rebar. |
| 08/06/2024 |
NPPO Pre-Construction |
|
Partial Pass |
Contractor is good to grout at the 4 foot mark |
| 08/07/2024 |
NPPO Pre-Construction |
|
Partial Pass |
Contractor called in for the trash enclosure from the 4 foot mark to the 6 foot mark a good to continue laying block |
| 08/08/2024 |
NPPO Pre-Construction |
|
Partial Pass |
contractor call in for trash enclosure, pre-grout inspection from the 4 foot mark to the 6 foot good to grout and install Bon beam and cap |
| 08/21/2024 |
NPPO Pre-Construction |
|
Partial Pass |
The contractor keeps calling him the wrong inspections. He need the trash enclosure for the floor and the apron, and it’s good to pour. |
| 12/09/2024 |
NPPO Pre-Construction |
|
Passed |
|