Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TD-DEV-0823-00378

Parcel: 13104399H


Addresses:

4777 E 29TH ST

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
02/09/2024 PDSD Engineering Division Pre-Construction SITE Passed Had pre-construction meeting onsite with Brandon Lacquement # (623) 341-4449 plans require (2) parking spaces (No handicap space required) curb area, and fence and gate with key pad and Knox box.

Brandon will be calling in inspections for Tuesday of next week the 13th and a majority of inspections are for zoning etc. that can be cleared off at that time.