Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - ENGR - Signage Final | Not Ready | Tree that will block stop/left turn only sign needs to be relocated. Drive through signage appears to be incomplete. | ||
| 12/16/2024 | COT - ENGR - Signage Final | Passed |