Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/07/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor needs to clean up in the back area. Contractor also needs to address the downspouts in the back of the building. |
| 04/09/2025 |
ENGR Engineering Final
|
|
Passed |
|