Inspection History Details
Inspection Status: Not Ready
Inspection History
Permit Number - TD-DEV-0724-00208
Inspection Description -
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2025 | Not Ready | Contractors gotta get a compaction test on the curb and the ramp | ||
| 01/16/2025 | Passed | Contractor passed the handicap rep and the curb with a 95% compaction | ||
| 01/22/2025 | Partial Pass | contractors good to pour sidewalk and the handicap ramp | ||
| 02/28/2025 | Partial Pass | Curb pour no rebar. 02/28/25 good to pour. | ||
| 03/05/2025 | Partial Pass | Contractors good to pour the curb from the trash enclosures all the way to the wall on the south end in the back of the building | ||
| 03/11/2025 | Partial Pass | Contractors good to pour the curb in the back of the building | ||
| 03/25/2025 | Partial Pass | Contractors good to pour the sidewalk by the drive-through and the dumpster | ||
| 04/07/2025 | Passed |