Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2025 | ENGR Engineering Final | Partial Pass | Contractor needs to finish the valley gutter the entrance of the building | |
| 11/19/2025 | ENGR Engineering Final | Passed |