Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Work on building is done except water and electricity connections. Contractor will backfill and compact trench correctly pending building inspections. Asphalt will be patched around building pad. Bollard footings were checked by building at pre slab inspection. Accessible route and Van Accessible ADA Parking need to be stripped per plan and with Van Accessible signage with 7' clear from ground due to access aisle. Follow site plan for striping of access aisles and hatch around pad. Install bike racks. When ready request Engineering final. |