Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE
Permit Number - TD-DEV-0723-00296
Inspection Description - SITE
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2025 | SITE | Partial Pass | 5/16/25 I discussed with Nick Herndon the depths needed 9” below pavement and where to start slopes behind curbs to get correct water harvesting areas. Also discussed need to get dg on all disturbed areas including easement for future bike path. Waddle is needed at any unprotected area for potential water egress from property. He will begin getting dg down starting next week. |
|
| 05/22/2025 | SITE | Partial Pass | I discussed with GC Nick Herndon that WHIAs Subgrade should by roughly 9” below adjacent pavement in larger WHIAs so that after DG goes down the WHIA bottoms will be about 6” below pavement. They look good in shape and in relation to BC. Some areas need to be lowered still. He plans on Hydroseeding trail easement area. | |
| 06/12/2025 | SITE | Partial Pass | Irrigation inspection will need Main Line pressure test be final called in 100lbs. for 20 minutes. see checklist for details. |