Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2025 | ENGR Engineering Final | Partial Pass | Permit and Development package not on site. Contractor notified. Holes noted are now at 12” Dia and 3’-9” Deep. contractor notified he is at risk if this any details completed don’t comply with approved D P. |
|
| 07/02/2025 | ENGR Engineering Final | Passed |