Inspection Status: Partial Pass

Inspection History

Date Description Inspector Results Comments
07/28/2025 Partial Pass We need to reinspect the pipe connections in the catch basins before backfilling.
07/29/2025 Partial Pass 7/29/25 OK to backfill pipe. Compact backfill properly for the loading above it-ie 95% for sidewalks or Flatwork. Submit compaction results to the permit in the portal.

Send pictures of catch basin cleaned out with pipe ends trimmed and connections finished for final okay.

7/31/25 Picture received and accepted, looks good to proceed.
09/18/2025 Passed 9/18/25 - Drainage pipe is installed to required specs.