Inspection Status: Partial Pass
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 10/30/2024 |
PDSD Site/Engineering Division - Landscaping |
|
Partial Pass |
Need to complete put in the DG |
| 11/04/2024 |
PDSD Site/Engineering Division - Landscaping |
|
Partial Pass |
The landscaping is not complete over by the railing needs to be backfilled. All those poles for the railing need to be backfilled and put back the riprap. |
| 11/12/2024 |
PDSD Site/Engineering Division - Landscaping |
|
Passed |
|