Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 12/04/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | Met with a contractor and looked over the project. They will be starting their work Monday of next week. I have reminded them that the plants for the site have not been tagged with proper tagging and should be done before they start their work. They will recall this inspection in in the next two weeks when work officially starts and will also call Lynn the stormwater follow up inspection every two weeks. | |
| 12/15/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | Pre-con by Dave ld contact name : Jon Sanders, phone number: 4053975209. |