Inspection Status: Partial Pass
Inspection History: Consultation SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/17/2024 |
Consultation SITE |
|
Partial Pass |
inform the contractor needs to call in for stormwater every two weeks and sweep |
| 07/16/2024 |
Consultation SITE |
|
Not Ready |
Superintendence not on site need landscaping inspections, grading inspection, STORMWATER inspections, asphalt striping signs |
| 08/02/2024 |
Consultation SITE |
|
Partial Pass |
I met with a contractor to see where they are at with this site. They are currently putting down ABC and will be paving either later next week or the following week. I will reschedule a grading inspection for next Thursday so we can look at where they are at with your work progress, and what they might need to do before their finals. |
| 08/19/2024 |
Consultation SITE |
|
Partial Pass |
Contractor needs to complete landscaping the basin install the bike parking bike, long-term parking striping stripe the handicap parking |
| 08/21/2024 |
Consultation SITE |
|
Passed |
|