Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/08/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Pre-construction meeting is complete. Once all stormwater controls are in place, “Stormwater Initial” inspection should be scheduled. Okay to begin initial land clearing prior to plant relocation. |