Inspection Status: Partial Pass
Inspection History: Consultation SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/16/2025 |
Consultation SITE |
|
Partial Pass |
Site consultation to review SWPPP updates. Book has been replaced due to previous water damage, Porta-potty spill has been remediated, porta-potties are staked down now. Wattle has been refreshed throughout site. *One area of issue behind trailer: wattle isn't in contact with the ground, rills need to be filled in. Requested that ADEQ sign be moved closer to public view. |
| 10/22/2025 |
Consultation SITE |
|
Partial Pass |
Doctor called in for consultation on the RCP pipe that’s at the entryway of the project installed 77 lineal feet of RCP pipe good to backfill |
| 12/17/2025 |
Consultation SITE |
|
Partial Pass |
In order to use adjacent property for employee parking, a Temporary Use Permit will be required. |