Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
Permit Number - TD-DEV-0623-00271
Inspection Description - For trash and recycling enclosures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2025 | For trash and recycling enclosures | Partial Pass | 12/3/25 Footer for two trash enclosures modified to partially function as retaining wall. Retaining wall runs between the two refuse enclosures as well. Rebar is correct for both refuse enclosures and retaining wall footer. Footer dimensions also correct. Submit compaction test report for retaining wall footer to the portal. Bollards are also set and will be poured with the refuse enclosure. Bollard Clearances and footer correct. One wall footer of the east refuse enclosure will be poured later than the retaining footer, because it is different configuration. Okay to pour refuse enclosure footers, and retaining wall footer. |
|
| 12/05/2025 | For trash and recycling enclosures | Partial Pass | 12/5/25 Rebar correct for slab floor. Subgrade is compacted. Slopes are correct. Dimensions and clearances correct. Okay to poor floor and associated retaining wall (detail F3) and wall between refuse containers. Request pre grout inspections for the walls when ready. |
|
| 12/08/2025 | For trash and recycling enclosures | Canceled | ||
| 12/18/2025 | For trash and recycling enclosures | Not Ready | Apron Mats not ready. Will push pour from 8:00 to 10:00 tomorrow morning. | |
| For trash and recycling enclosures | Scheduled |