Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 10/24/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Okay to pour western two head wall footings. Headwall on east side of driveway not complete or approved for concrete. |
| 10/29/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Headwall footings for two culverts under entrance and for stormwater basin: depths and reinforcement are good, okay to pour. |
| 10/30/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
5 headwalls along South of site, two require an extra horizontal reinforcement bar at the bottom, once corrected, okay to pour. |