Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Paving
Permit Number - TD-DEV-0623-00271
Inspection Description - ENGR Paving
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2025 | ENGR Paving | Partial Pass | 12/3/25 Paving inspection for asphalt paving to be placed 7:30AM. Compaction is being tested at the same time as inspection. Results so far have all complied at 100% or above. Paving will be done in two lifts. First lift 1.5" and then second lift later 1.5". contractor will send me pictures of areas that needed to be scraped and rolled so all areas are compacted with no loose material. Contractor will start paving at the northwest side of site and will leave the area around the refuse enclosures unpaved and then continue south and around the building all the way to the northeast. Okay to pave this area, pending pictures, complying compaction tests in all areas and weather permitting. |