Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2024 | ENGR Engineering Final | Partial Pass | Partial pass, TCO4 ready on south side only. | |
| 11/18/2024 | ENGR Engineering Final | Passed | This job has been completed and is CO Ready. |