Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - ENGR - Stormwater
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2023 | COT - ENGR - Stormwater | Re-inspection required | Concrete washout on dirt and or dirt piles is not allowed and must be cleaned up please asap. Washout area is adjacent to a drain-way, please install a proper washout per Tucson requirements |