Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | 8/27/26 I discussed the project with Keith Campbell on phone. The Fabricated Metal Storage Building is almost complete and is located on the site per plan. No utilities needed it is essentially a storage shed with metal framed walls anchored to the asphalt with rock spikes. Everything noted on site is Existing. Site Complete. |