Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/10/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Contractor inform me that they’re modifying the existing trash enclosure and modifying the gate to go with. It informed him that the apron needs to be 6 inches deep. |