Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/01/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
I’m passing the Precon, but I still forward the contractor. He needs to have a set of plans on site at all times. |
| 11/05/2024 |
PDSD Engineering Division Pre-Construction SITE |
|
Partial Pass |
for the contractor to call in every two weeks for the stormwater swipe inspection. Informed the contractor he needed to install the trout rocks and wattles. Swap inspections, sweep inspections |