Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2025 | Partial Pass | contractors good to backfill the storm drain on the west side of the building storm drains 8 inch PVC pipe coming off the roof. |