Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2024 | ENGR Engineering Final | Passed | ||
| 03/15/2024 | ENGR Engineering Final | Partial Pass | depress landscaped areas per note number four. Provide long-term bicycle parking per note number 14. Provide proper staking per plan detail. Install pinholes for trash enclosure dumpster doors to be held in the open position. Complete all remaining work. Remove abandoned curb stop in landscape area. | |
| 03/21/2024 | ENGR Engineering Final | Partial Pass | reviewed landscape plan: trees not staked per plan and “nursery stake” still present on all existing trees. ok for TCO4 |
|
| 03/25/2024 | ENGR Engineering Final | Partial Pass | ||
| 03/27/2024 | ENGR Engineering Final | Not Ready | call Shane 30 minutes prior to inspection to meet at 520-370-4613. Complete work as shown on City approved plans. Provide documentation for any changes. |