| 04/01/2025 |
|
|
Partial Pass |
4/1/25, footings for front stairs and ramps, footing for side stair, ramp and trash enclosure are good to pour. |
| 04/03/2025 |
|
|
Partial Pass |
04/03/25 Ramp walls and stair at front good to pour, west side ramp, stair and trash compactor good to pour. 15 light pole cassions good to pour. Observed, 5/8 x 10’ ground rod with #4 wire tied to the 5/8 cage and coming up to service light pole. |
| 04/07/2025 |
|
|
Passed |
04/07/25, Side walk ramp is good to pour. Stair riser was 6-7/8 min required by code is 7", tread depth is at 13" min required by code is 11". |